Industry 5.0: Putting people at the center of production
We accompany industrial companies in bringing together technology, work design, resource use and delivery capability.
Start with a concrete production process and prove effect.
What Industry 5.0 means for manufacturers
The European Commission describes Industry 5.0 as an approach that puts people, sustainability and resilience at the heart of industrial development. Existing automation and digitalization provide a foundation.
For manufacturers, this means assessing technology investments by how they improve working conditions, conserve resources and help teams manage disruptions. We define ways to measure those outcomes in a specific production process.
How we support your Industry 5.0 project
We work with production management, employees, quality management, IT and maintenance on a limited use case or a roadmap for several locations.
- Workstations and processes – Capture loads, sources of error and qualification requirements and evaluate suitable assistance or automation solutions.
- Resource efficiency Bring together data on energy, materials, scrap and rework and prioritize actions.
- Resilient operations – Consider critical plants, suppliers and IT/OT interfaces as well as consider fallback and restart options.
- Piloting and scaling – Measure the effect on a line or workstation and develop standards for other areas.
Your benefits
What you gain from working with us
Better work design
Requirements for ergonomics, usability and qualification are taken into account at an early stage in the decision.
Lower resource consumption
The consideration of energy, scrap and rework makes savings potential per process visible.
Robust production processes
Critical dependencies are documented and alternative processes prepared.
Better-informed technology decisions
The pilot assesses technical performance together with impact on work, quality and operations.
Lessons you can apply on other lines
Documented requirements, data and releases facilitate the transfer to other areas.
How we work with you
We tailor the process to your situation. Each step gives you a concrete result to guide the next decision.
1. Select a pilot area
We define a line, station or supply chain and clarify the goals with those responsible.
2. Measure the baseline
We collect working conditions, process data, resource consumption and critical dependencies.
3. Compare options
We evaluate different technical and organizational approaches based on jointly agreed criteria.
4. Test on the production line
The selected approach is examined with participating employees in the limited operation.
5. Evaluate the impact
We analyze changes in productivity, quality, resources and working conditions.
6. Roll out and verify
We are preparing standards, qualification and the next implementation steps for comparable areas.
Industry 5.0 FAQs
What does Industry 5.0 mean for a manufacturing company?
The European Commission identifies three priorities for Industry 5.0: human-centered design, sustainability and resilience. Manufacturers can turn these priorities into practical decisions. When testing a change, we assess its effects on working conditions, resource use, quality and the ability to manage disruption. This lets teams evaluate the approach in a real production process.
When modernizing an assembly line, for example, test whether a lifting aid reduces physical strain, damage to parts and reliance on a few experienced staff members. Report all three effects together and record which ones the pilot measured.
How is Industry 5.0 different from Industry 4.0?
Industry 4.0 emphasizes the networking and digitalization of production. Industry 5.0 builds on this foundation and extends the assessment to include working conditions, resource management and resilience. For example, a networked system can not only provide performance data, but also support employees in difficult tasks or make disruptions more quickly detectable.
A digital worker tour illustrates the difference. The networking provides the right product variant. The human-centered design decides how understandable the instructions are at the station and how employees intervene in special cases. The extended assessment also includes whether the line can safely continue to work with an approved replacement sequence in the event of a failure of the terminal.
Which businesses can start with Industry 5.0?
An entry is also possible with existing machines and limited budget. Particularly helpful is a process in which the teams involved can identify a concrete improvement, such as less rework or lower physical load. We clarify which data is available and whether the effect of a measure in a pilot area can be comprehensibly recorded.
A small operation can start with a frequent setup process. The team management observes several changes and records waiting time, search effort and handles. From this, for example, differently arranged tools or visual instructions can be tested. For the comparison, logged orders of the same product family and feedback from the affected layers are sufficient.
What is suitable as a first pilot project?
A good pilot area has a clear responsibility, a recurring process and a measurable need for improvement. Examples are a station with regular scrap, high load or long interruptions. We set the scope and measurement period together and look at how the change affects people, quality and operations. Proven results can then be tested for further lines.
When choosing between several ideas, a short assessment of the expected benefits, measurability and intervention in ongoing operations is suitable. For an attempt to reduce rework, two comparable order groups and a pre-agreed quality criterion would make sense. The decision on a takeover is made after the evaluation with the responsible shift teams.
How do we involve production staff?
Employees are already involved in monitoring existing processes and in describing requirements. You can point out exceptions, handles and loads that are barely visible in process documentation. In the pilot, they evaluate the usability under real conditions. The feedback flows into the selection of the solution, qualification and later introduction.
A visit with representatives of several shifts brings different working methods and exceptional cases to light. In a new worker tour, the team can first test typical steps and borderline cases and record their observations in a structured manner. The feedback results in specific requirements, such as larger displays, fewer operating actions or faster access to variant information.
How do we assess ergonomic strain?
Together with the competent experts, we record which activities are burdensome and when they occur. Possible changes relate to workflow, tools, distribution of tasks or design of the station. For the assessment, observations and feedback before and after the change are compared. Requirements for occupational safety and clearance are coordinated with the responsible bodies.
One example is the repeated removal of heavy parts from a deep container. In the inventory, grip height, frequency, load and differences between product variants are recorded. Adjustable provision can then be tested on the same orders. Occupational health and safety professionals and employees jointly assess whether the relief continues during shift operations.
When is the use of assistance systems worthwhile?
Assistance systems can help if employees need to find information quickly in complex processes or identify errors early on. We check which information is needed, whether the display fits the working environment and which decisions are made by humans. A pilot shows whether the support actually facilitates the work. Operation, maintenance and failures are part of the assessment.
In the case of a visually guided assembly, the system could provide information on the selection of parts and, in the event of an unclear assignment, call in a person. In the test, confusion, time pressure, gloves and a broken connection should also occur. This shows whether corrections can be carried out traceably and which cases still require a manual check.
How do we decide whether automation makes sense?
The decision depends on process stability, variants, quality requirements and impacts on employees. We compare technical and organizational possibilities and consider effort over the entire period of use. The pilot examines how the plant and employees work together, how exceptions are handled and whether the expected improvement occurs under real conditions.
A handling task with many special parts can be improved, for example, by a simple workpiece holder, while a robot cell can rather be tested in the case of frequently recurring, standardized parts. The comparison includes conversion time, space, maintenance and available spare parts. For the decision also counts how much effort a product change later causes.
Which metrics help us track resource consumption?
The indicator should show for which performance resources are consumed. Examples are energy per good part, material input per order, scrap or quantity of rework. We define measurement range, time period and data source together. In addition, it is examined how product mix, utilization or seasonal factors influence the comparison. In this way, initial measures can be prioritized more robustly.
Energy per good part should be recorded for comparable orders. If variants have different material thicknesses and runtimes, groups per product family or separate values for operation and standstill may be useful. The evaluation then shows whether an improvement is due to the process or, above all, has arisen through another order mix.
How do we proceed if data on production is missing?
We first determine which decision the data should support. For a delimited pilot, often existing meters, manually detectable observations or a few additional measuring points are sufficient. Jurisdiction and measurement methodology should be clear. We then check whether the data is sufficiently reliable and whether a permanent technical recording for other areas is worthwhile.
To get started, for example, it is possible to record for one week when a machine produces, equips or waits for material. The comparison with layer protocol and job data shows where the sources deviate from each other. If this sample provides a viable basis for decision-making, it can specifically limit the effort for additional sensors or interfaces.
How can sustainability and profitability be assessed together?
We compare resource consumption, investment and operating costs as well as impact on quality and delivery capability. In this case, variants can have different advantages and disadvantages. A transparent evaluation makes assumptions and uncertainties visible. If data is missing, a limited trial will help, such as the scrap rate or the energy demand under comparable conditions. This creates a better basis for investment decisions.
In a drying process, a lower temperature can save energy and at the same time increase the cycle time. For both variants, costs per good part, capacity and error rate are compared under similar conditions. A consideration with different loads shows under which assumptions the measure is worthwhile and where a further test is required.
What is the role of circular economy and reuse?
Relevant is where materials are lost in the process or a product can be repaired and reused with manageable effort. We look at material flows, quality, separability and existing repatriation routes. Possible measures range from less scrap to usable take-back or repair processes. We assess the suitability on the basis of technical, organizational and economic conditions.
In practice, a material flow can first be tracked, such as rejects from a certain production stage. We distinguish material that can be recycled internally with the same quality from material that needs a different use or processing. The assessment also includes sorting effort, transport and responsibility for re-approval of quality.
What makes a production process resilient?
A resilient process knows its critical dependencies and can resort to prepared possibilities in the event of a disturbance. This includes, for example, representations, available replacement capacities or a coordinated restart. We examine concrete scenarios, such as plants, personnel, suppliers and systems interact. In this way, decisions on prevention and investments are geared towards recognizable risks.
In the event of a malfunction in the central compressed air supply, it is possible, for example, to check which stations must be available again first and which production steps are acceptable in the meantime. For each alternative, capacity, permitted duration and release steps are documented. A short restart test shows whether procedures, tools and personnel are jointly available if necessary.
How do we look at supplier dependencies?
We record for a process which materials and services are particularly critical and how quickly replacement would be available. Important criteria include replacement time, alternative sources of supply and quality requirements when changing. The assessment helps to prioritize preventive measures and escalation pathways. Depending on the initial situation, additional transparency, realistic buffers or coordinated avoidance options are useful.
In the case of a special part with a long delivery time, purchasing and quality can jointly understand which stock would actually be available in the event of an interruption. Subsequently, dependencies such as common pre-suppliers and necessary initial samples are considered. The result determines which alternatives have already been approved and how long a new source of supply realistically needs for use.
How do connected machines and cooperation between IT and OT contribute?
Networked facilities can provide data for maintenance, quality and production control. We clarify which systems exchange data for what purpose and who is responsible for changes, releases and disruptions. Operational requirements, availability and information protection are considered early on. A clear cooperation between production, IT and operating technology facilitates the introduction and later operation.
For a condition monitoring at a plant, it is specified, for example, which measured values the maintenance receives and how changes to alarm limits are released. In the event of a loss of connection, it must be clear what still remains operable on the machine. Common acceptance criteria avoid that a technically functioning data flow causes problems in shift operation.
How do we use existing management systems for Industry 5.0?
Much can be classified into existing processes for quality, environmental management, occupational safety or continuity. We check which metrics, releases and responsibilities already exist. The pilot specifically complements what is required for the question. Results and measures can then be followed through the same reporting and improvement processes that are already used in the company.
For example, a plant can incorporate the measures from an ergonomic and material pilot into its existing improvement program. Quality control, environmental data and approvals retain their responsible bodies. Only the pilot-related goals and evidence are added, so that the management can assess the progress in the regular management report and decide to transfer it to other lines.
How do we avoid optimizing individual metrics at the expense of other goals?
We determine before the pilot which results should improve and which side effects must be taken into account. Higher output can, for example, cause additional energy consumption, more rework or load. Therefore, relevant targets are considered together. A comparison with employees, production management and business teams helps to document the weighing and remaining uncertainties in a comprehensible way.
When the cycle time is changed, for example good parts per hour, errors per lot and the feedback on physical stress can be considered together. Before the test, the parties shall agree on thresholds for termination or adaptation. This makes it possible to classify a surplus income if the rework increases in parallel or employees report more burden at individual stations.
What should we clarify before rolling out to other sites?
Before a transfer, we check which conditions from the pilot also apply at the other location. This includes product variants, existing facilities, qualifications, data and operationally relevant specifications. Technical settings, decisions and open points are documented. On this basis, those responsible can decide between a direct takeover, an adaptation or a new test.
A transmission document may contain minimum requirements for data collection, work equipment and qualification as well as a short acceptance test. During the location comparison, other layer models and different spare parts supply are also tested. If crucial conditions cannot be proven from the first attempt, the second location can first test the affected change in its own limited pilot.
How much effort does the engagement require?
The effort depends on the number of locations, scope of the selected process, existing data and participating business teams. An inventory at one station requires a different scope than developing a roadmap for several plants. In the initial discussion, we determine together which decision should be prepared and which contributions your teams can plan for it.
For planning, contributions from the departments can be distinguished from work in the plant. A short on-site observation can be evaluated with existing metrics, while a cross-location comparison requires coordinated definitions and more time for data reconciliation. The offer should show the expected results and the required internal contacts for each phase.
What should we bring to the initial meeting?
A short process description, the affected area and an example of the problem to be solved are helpful. Initial data on quality, workload or resource consumption can facilitate classification. We discuss which goals you want to connect and which pilot area is realistic for this. A complete data collection is not required for the first interview.
If available, bring photos or a sketch of the station, an anonymized sample of scrap or setup time, and an assessment from production. Using such an example, we can together describe a starting point, define a verifiable goal and specify which areas of expertise should be involved in a first attempt.
Connecting production, engineering and management
We help to combine production indicators with requirements for sustainability, work design and operational continuity. In doing so, we use existing management systems and reporting channels where they make sense.
Related services
Digital transformation · ISO 14001 consulting · ISO 22301 consulting
- On-site assessment of processes and machinery
- Metrics for quality, energy and materials
- Employee involvement and work design
- Dependencies across production, operational technology and the supply chain
- Select pilot areas based on measurable strain and losses
- Consider ergonomics, usability and training needs
- Compare assistance and automation options in production
- Measure material flows, rework and energy use per unit of output
- Plan workarounds and production recovery
- Clarify approvals and coordination across production, IT and OT
- Roll out proven solutions to other lines and sites
Initial consultation
Briefly tell us where you stand. In the initial consultation, we’ll clarify your objective and discuss what to do next.